欢迎访问国际泥沙信息网! 关键词: 三门峡水库,潼关高程,泥沙淤积,水沙条件[gap=12108]Keywords: The Sanmenxia Reservoir, Tongguan stage, Sediment deposition, Runoff.
基于16个网页-相关网页
After 2 years operation of the Sanmenxia Reservoir, the elevation at Tongguan run sharply up.
三门峡水库蓄水运用2年后,潼关高程急剧抬升。
The Sanmenxia Reservoir, located in the middle reaches of the Yellow River, has passed three stages since it was built up in 1960.
三门峡水库建成后,先后采用了蓄水拦沙、滞洪排沙和蓄清排浑调水调沙三种运用方式,水库在运用过程中也相应的分为三个阶段。
The Department took part in the study on the renovation of Sanmenxia Reservoir, this picture shows sediment sluice from the Reservoir.
图为三门峡水库枢纽正在泄流排沙,泥沙所参加了三门峡水库改建工程的科研工作。
应用推荐